Dining room: 2/3 of the room done to round-1 level, 1/3 still needs everything done to it. On the back wall is a sample of the color we're going to paint this room, but not this week (click to see larger version).
Bathroom: Here's the new color, which we both really like. We also re-stained the sink cabinet to better match the antique pine cabinet which will eventually go on the wall (which you can see reflected in the mirror), once our studfinder starts working. Actually for now the cabinet will go on the wall behind the toilet, but as soon as budget allows, that white beat-up cheapo sawdust cabinet you see will be replaced by something lower and the pine cabinet will go above that.
The mirror and light above the sink have GOT to go, but alas, not until we recover from The Attack of the HVAC System.
And just because I think it's cute: Pug Yin-Yang.
Subscribe to:
Post Comments (Atom)
3 comments:
Wow.. you have been busy..
and I thought building a pond was a PITA..
This is totally off-topic, but... have you been having any problems with your sitemeter account? Mine's been wonky all week and they're telling me it's fine but it isn't. You?
ege, mine has always been periodically wonky, just in that I'll click on it and it will claim to be unavailable, but honestly I think I've only looked at it one time this week and that was in the bleary-eyed insomniac wee hours as I was looking for weird search terms. I'll be on the lookout for other general wonkiness.
Post a Comment